Flat number, booked date, clean walkthrough in Killeen
Weekday single zone mini split install is $2,400 materials and labor. Weekend work is $2,600. Materials deposit is $400 to book; balance is due on completion.
| Standard single zone install, weekday | $2,400 materials and labor |
|---|---|
| Same install, Saturday or Sunday | $2,600 materials and labor |
| Joker day | One day each week priced under the weekday rate, day shown on the home page |
| Booking deposit | $400 toward materials |
| Balance | Due on completion |
| Non standard work | Quoted before any work begins |
| Bid line item | Single zone mini split, materials and labor: weekday $2,400 weekend $2,600 |
| Note | Standard single zone: indoor head, outdoor unit, line set |
| Note | Drain, circuit, penetrations, size confirmed at site walk |
| Note | One call: Jester Climate at (512) 297-7493 |
| Scope confirmed | At the site walk |
| Contact | (512) 297-7493 |
The number you plug into the bid
Standard single zone mini split installation is $2,400 on weekdays, materials and labor. It is $2,600 on weekends. That is the line for a standard job.
One Joker Day each week is priced lower than the weekday rate. The day changes week to week. It is posted on the home page. Call (512) 297-7493 if you are bidding before you look.
- Weekday standard single zone is $2,400 materials and labor
- Weekend standard single zone is $2,600
- Materials deposit is $400 to book
- Balance due on completion
Pick the date. Get it confirmed.
You pick the install date. It gets confirmed. If anything changes, you get told.
Book it after drywall is down and the outdoor location is clear. Do not book against a trade that is still in the way. Call (512) 297-7493 to book.
What the number covers and what it does not
The weekday figure is a standard single zone mini split install, materials and labor. It covers the indoor unit, outdoor unit, line set, condensate drain, and the circuit confirmed at the site walk. Anything outside that scope is non standard.
If it is not standard, you get a quote first. Extra work does not start without that quote. That keeps extras off the walkthrough conversation.
Walkthrough is when your client judges you
The owner walks the ADU with you. They see the head, the line set, the outdoor unit, and the penetrations. That is the install they remember.
Expect caps on, condensate draining, and the outdoor unit set and level. If the site walk changed the plan, that change was already quoted.
Repeat jobs, one phone number
Call (512) 297-7493 to set up repeat scheduling. That is all you do on the repeat side. Service area is Austin and the I-35 corridor.
ADUs, casitas, and pool houses in Killeen take the same standard line item when the scope matches. Each address still gets a site walk. Size and routing still get confirmed on site.
Site walk before you lock equipment
A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.
Line set path, drain routing, penetration location, and circuit are confirmed at the site walk. Permits stay with the owner or the general contractor. Requirements vary by jurisdiction. Jester Climate is not a permitting authority.
Included in the number
- Indoor head mounted at the location confirmed at the site walk
- Outdoor unit set on the pad or bracket confirmed at the site walk
- Refrigerant line set installed on the path confirmed at the site walk
- Condensate drain installed on the route confirmed at the site walk
- Electrical hookup as confirmed at the site walk
- Start up and operation check
- Work area swept at completion
Quoted before work begins
- Additional indoor heads or additional outdoor units
- Concealed line set inside finished walls or ceilings
- Condensate pump
- Panel work or a new circuit beyond the hookup confirmed at the site walk
- Cutting, coring, or patching beyond a standard penetration
- Roof set, lift, or outdoor relocation after the unit is placed
Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.
- Indoor wall location marked
- Outdoor location clear and accessible
- Line set path left open
- Electrical condition matching what the site walk confirmed
- Building and yard access for the crew
- Other trades out of the work area
- Superintendent reachable by phone
- Confirm the walkCrew checks indoor location, outdoor location, line path, drain, and circuit against the site walk notes.
- Set indoor and outdoorHead mounts on the marked wall. Outdoor unit sets on the pad or bracket confirmed at the site walk.
- Run line set and drainLine set and condensate follow the confirmed path. Penetrations match the ones already walked.
- Hook up and startElectrical hookup matches what the site walk confirmed. System is started and checked.
- Sweep for walkthroughWork area is swept and left ready for your client walkthrough. Balance is due on completion.
Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.
$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.
$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.
Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.
Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.
- Can I put $2,400 on the estimate today?
- Yes, for a standard single zone mini split install on a weekday, materials and labor. Use $2,600 if you are scheduling a weekend. Off standard items wait for a quote before work starts.
- What is the $400 and when is the rest due?
- Materials deposit is $400 to book the date. Balance is due on completion. Quoted extras, if any, are on the table before work starts so completion day is not a surprise.
- Who pulls permits inside Killeen city limits?
- You do, or the owner does. Requirements vary by jurisdiction. Jester Climate is not a permitting authority. Confirming that is on the owner or the general contractor.
- Where should this fall in my trade stack?
- Walls closed, outdoor location clear, circuit ready as confirmed at the site walk. You name the date from there. Call (512) 297-7493 and the date is either confirmed or you are told it is not.
- I am stacking casitas this year. How do I set repeat work?
- Call (512) 297-7493 to set up repeat scheduling. Each address still gets a site walk. Standard jobs use the same weekday or weekend number.
One number, one call, one line item in Killeen, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.