The main system was never sized for the room you are adding in Buda. Put $2,400 in the bid for a standard single zone mini split on a weekday, materials and labor. Call (512) 297-7493.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split, standard weekday install, materials and labor, $2,400
NoteWeekday standard: $2,400 materials and labor
NoteSize, line set, circuit, drain: confirmed at site walk
NotePoint of contact: (512) 297-7493, Jester Climate
Scope confirmedAt the site walk
Contact(512) 297-7493

The number you plug into the bid

Use $2,400 as the HVAC line on a weekday single zone. Materials and labor sit in that number. Weekend work is a different number.

Drop it in the estimate today for a standard install. If the room is not standard, wait for the quote before you lock your number to the owner.

  • $2,400 weekday, materials and labor
  • $2,600 weekend, materials and labor
  • Joker Day under the weekday rate, shown on the home page
  • $400 materials deposit to book

You pick the date, it gets confirmed

Name the day that fits your sequence after drywall. Call (512) 297-7493. Weekend dates bill at $2,600.

You pick the date, it gets confirmed, and if anything changes you get told. Joker Day is listed on the home page when the calendar can flex. Do not treat a date as set until it is confirmed.

Garage conversions and added rooms in Buda

A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.

Line set path, circuit, drain routing, and penetration location are confirmed at the site walk. Service area is Austin and the I-35 corridor. Buda work falls in that corridor.

What the owner sees at walkthrough

Your client looks at the head, the outdoor unit, the penetration, and the covers. You are the one standing there at walkthrough. That is the list they check.

Call out indoor and outdoor locations at the site walk. Direct field questions to (512) 297-7493.

Standard versus quoted work

$2,400 is weekday materials and labor for a standard single zone. Non standard work is quoted before any work begins. You see that quote before the crew starts it.

Do not carry a guess in the bid for a pump, extra zone, panel work, or odd routing. Those items are quoted. The standard number stays the standard number.

One call for the next Buda job

Call (512) 297-7493 to set up repeat scheduling. Keep one line item in the estimate. Keep one phone number for the sub.

Jester Climate covers Austin and the I-35 corridor. Buda jobs use that same number. Ask for the Joker Day on the home page if the calendar can move.

Scope of workStandard single zone install

Included in the number

  • Indoor head mounted at the location confirmed at the site walk
  • Outdoor unit set at the location confirmed at the site walk
  • Line set installed on the path confirmed at the site walk
  • Condensate drain installed on the route confirmed at the site walk
  • Electrical tie in to the circuit confirmed at the site walk
  • Penetration and seal at the location confirmed at the site walk
  • System start and control handoff to the superintendent

Quoted before work begins

  • Extra zones or extra indoor heads
  • Condensate pump
  • New circuit or panel work
  • Line covers, chase, or concealment that is not standard
  • Roof, attic, or interior routing that is not a standard path
  • Pads, stands, or brackets that are not standard
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Indoor and outdoor locations left clear and accessible
  • Panel powered
  • Framing and wall status matching what was confirmed at the site walk
  • Path from truck to both unit locations left open
  • Superintendent phone on site
  • Owner or general contractor has confirmed permit status for the jurisdiction
Install dayPhase order, no clock times promised
  • Site checkCrew verifies access and the locations confirmed at the site walk. Non standard conditions are quoted before that work begins.
  • Outdoor setOutdoor unit is set at the location confirmed at the site walk.
  • Indoor mountIndoor unit is mounted. Penetration is made at the confirmed location.
  • Lines and drainLine set, drain, and electrical are run on the paths confirmed at the site walk.
  • Start and GC walkSystem is started. Superintendent is shown the indoor unit, outdoor unit, and controls.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Can I put $2,400 in a Buda bid today?
Yes for a standard single zone mini split on a weekday, materials and labor. Weekend work is $2,600. Non standard work is quoted before any work begins.
What holds the date?
$400 materials deposit to book. Balance due on completion. Call (512) 297-7493.
Do you pull the permit?
Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming permit status is on the owner or the general contractor.
Garage conversion, west glass, hot attic. Still the standard number?
$2,400 is the weekday install for a standard single zone. A casita reads smaller than it loads. West glass and a hot attic push the size up. Size, circuit, and routing get confirmed at the site walk.
Does the standard install include a new circuit?
Circuit size is confirmed at the site walk. Tie in to the circuit confirmed at the site walk is part of a standard install. New circuit or panel work is quoted before any work begins.
Related builder sheets
Book it

One number, one call, one line item in Buda, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493