Mini split installs for New Braunfels ADUs and casitas
Standard single zone mini split installation is $2,400 on weekdays, materials and labor. That is the number for ADUs, casitas, and pool houses in New Braunfels. Call (512) 297-7493.
| Standard single zone install, weekday | $2,400 materials and labor |
|---|---|
| Same install, Saturday or Sunday | $2,600 materials and labor |
| Joker day | One day each week priced under the weekday rate, day shown on the home page |
| Booking deposit | $400 toward materials |
| Balance | Due on completion |
| Non standard work | Quoted before any work begins |
| Bid line item | Single zone mini split, weekday, materials and labor: $2,400 |
| Note | Standard single zone: $2,400 weekdays, materials and labor |
| Note | Line set, circuit, drain, size confirmed at site walk |
| Note | Point of contact: (512) 297-7493, Jester Climate |
| Scope confirmed | At the site walk |
| Contact | (512) 297-7493 |
The number for the bid
Standard single zone mini split installation is $2,400 on weekdays, materials and labor. Weekend work is $2,600. Use those figures on ADUs, casitas, and pool houses when the job is standard.
One JOKER DAY each week is priced lower than the weekday rate. Which day it lands on changes week to week. The current day is on the home page.
- Weekday standard single zone: $2,400
- Weekend standard single zone: $2,600
- JOKER DAY: see the home page
- Materials and labor in the figure
How the job is booked
A $400 materials deposit books the slot. Balance is due on completion.
Non standard work is quoted before any work begins. The quote lands before tools come out.
Scheduling on your jobsite
You pick the date. It gets confirmed. If anything changes you get told.
Call (512) 297-7493 with the New Braunfels address. Sequence it after drywall if that is how you run the job.
Site walk before the install
Line set length, circuit size, drain routing, penetration location, and equipment size are confirmed at the site walk. Anything variable is confirmed there.
A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.
Walkthrough in front of your client
The indoor head is on the wall. The outdoor unit is set. Penetrations are part of the install your client can see.
Finish paint and trim stay with your trades. Keep those on your own punch list.
Repeat work in New Braunfels
Call (512) 297-7493 to set up repeat scheduling. Use that number on every ADU, casita, and pool house.
Service area is Austin and the I-35 corridor. New Braunfels is on that corridor. Jester Climate is the name on the invoice.
Included in the number
- Indoor head mounted at the location confirmed at the site walk
- Outdoor unit set at the location confirmed at the site walk
- Line set run, path confirmed at the site walk
- Condensate drain run, path confirmed at the site walk
- Circuit connected, size confirmed at the site walk
- Penetration at the location confirmed at the site walk
- System started and checked
- Work area picked up before the crew leaves
Quoted before work begins
- Additional indoor or outdoor units
- Condensate pump
- Electrical work beyond the standard circuit connection
- Line hide, chase, or trim
- Roof mount or other non standard outdoor placement
- Takeout of an existing system
Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.
- Indoor wall clear at the mount location
- Outdoor location clear for the set
- Path open from truck to both locations
- Panel accessible
- Site contact reachable
- Owner or general contractor has confirmed permit requirements for the jurisdiction
- Other trades out of the work area
- Site confirmCrew checks indoor and outdoor locations against the site walk. Equipment size, penetration location, drain routing, circuit size, and line set path get a last look.
- PenetrationsWall penetration is made at the location confirmed at the site walk.
- Set equipmentIndoor head goes on the wall. Outdoor unit is set. Mount type was confirmed at the site walk.
- Lines, drain, circuitLine set, condensate drain, and circuit are run as confirmed at the site walk. Non standard conditions already have a quote.
- Start and leaveSystem is started and checked. Work area is picked up. Pay the remaining balance when the job is done.
Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.
$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.
$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.
Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.
Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.
- Is $2,400 the number I can bid in New Braunfels?
- For a standard single zone mini split installation on a weekday, yes. Materials and labor sit in that figure. The site walk confirms the job is still standard.
- Who pulls permits for a casita in New Braunfels?
- Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.
- What if the pool house has a wall of glass?
- Glass and a west wall change the load. A pool house often reads the same way. Equipment size is confirmed at the site walk.
- I have multiple ADUs this year. How do I keep you on the work?
- Use (512) 297-7493 for the next site. Ask to set up repeat scheduling. Pick a date per address.
- What makes a job leave the $2,400 number?
- Anything outside a standard single zone mini split installation. Extra units, pumps, panel work, chases, and odd mounts are examples. Get a quote on those items first. Work does not start on them without it.
One number, one call, one line item in New Braunfels, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.