One Mini Split Number for Temple Remodel and Conversion Bids
The main system was never sized for the garage conversion or the added room. Standard single zone mini split installation is $2,400 on weekdays and $2,600 on weekends, materials and labor. Call (512) 297-7493; $400 materials deposit books the date, balance due on completion.
| Standard single zone install, weekday | $2,400 materials and labor |
|---|---|
| Same install, Saturday or Sunday | $2,600 materials and labor |
| Joker day | One day each week priced under the weekday rate, day shown on the home page |
| Booking deposit | $400 toward materials |
| Balance | Due on completion |
| Non standard work | Quoted before any work begins |
| Bid line item | Std single zone mini split install $2,400 weekday, $2,600 weekend |
| Note | Std cover: indoor head, outdoor unit, line set, condensate |
| Note | Site walk confirms size, circuit, drain, and penetrations |
| Note | Point of contact: Jester Climate, (512) 297-7493 |
| Scope confirmed | At the site walk |
| Contact | (512) 297-7493 |
The Number You Plug Into the Bid
Temple remodel and conversion work often adds a conditioned room the existing system was never sized for. Use $2,400 for a standard single zone mini split on a weekday. Use $2,600 if the date falls on a weekend.
One joker day each week is priced lower than the weekday rate. That day changes week to week and is revealed on the home page. Check the home page before you lock the bid date.
- $2,400 weekday, materials and labor
- $2,600 weekend, materials and labor
- Joker day priced lower than weekday; see home page
- $400 materials deposit to book
- Balance due on completion
- Non standard quoted before work begins
You Pick the Date; We Confirm It
Call (512) 297-7493 and pick the date that fits the job. The date gets confirmed. If anything changes, you get told.
A $400 materials deposit books the date. Balance is due on completion. Put us after drywall if that is when you want the heads on the wall; say so when you call.
Size Is a Rule of Thumb, Confirmed On Site
Temple garage conversions and added rooms are not a copy of a bedroom on the main system. Sizing is a rule of thumb only. The size gets confirmed on site.
Bring the plan and the orientation to the site walk. Jester Climate confirms equipment size there, not from a phone photo.
- A casita reads smaller than it loads
- West glass and a hot attic push the size up
- Garage conversions load unlike a main system bedroom
- Size, circuit, drain, and penetrations confirmed on site
What the $2,400 Covers, What Gets Quoted
Standard single zone mini split installation is indoor unit, outdoor unit, interconnecting line set, condensate drain, and startup. Mounting method and routing are confirmed at the site walk.
If the job is not standard, you get a quote before the crew starts. Extra heads, condensate pumps, panel work, and concealment sit outside the $2,400.
What Your Client Sees at Walkthrough
The indoor unit is mounted per the site walk. The outdoor unit is set per the site walk. Penetrations are sealed and the floor is swept.
You stay the point of contact with your client. Call (512) 297-7493 if something needs attention before the owner walk. Jester Climate works Temple along the I-35 corridor.
Repeat Scheduling Across Temple Jobs
Call (512) 297-7493 to set up repeat scheduling. Use that number on every Temple job that needs a mini split.
One line item. One phone call. Drop the same $2,400 weekday number into the next bid.
Included in the number
- Indoor unit mounted at the location set at the site walk
- Outdoor unit set at the location set at the site walk
- Interconnecting line set installed on the confirmed route
- Condensate drain installed on the confirmed route
- Electrical hookup as confirmed at the site walk
- System started and operation checked
- Penetrations sealed
- Work area cleaned
Quoted before work begins
- Additional indoor units or extra zones
- Condensate pump
- Circuit or panel work beyond the confirmed hookup
- Line hide, soffits, or concealment carpentry
- Non standard outdoor mounting
- Relocation of existing equipment
Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.
- Site walk done and unit locations agreed
- $400 materials deposit paid
- Indoor wall surface ready for the mount
- Outdoor location clear of stored material
- Power available as discussed at the site walk
- Access open to indoor and outdoor locations
- Other trades clear of the immediate work area
- Confirm layoutCrew checks indoor and outdoor locations against the site walk. Changes get quoted before work begins.
- Open the pathPenetrations and routing follow what the site walk confirmed. Line set and drain go in on that path.
- Set the unitsIndoor unit mounts on the agreed wall. Outdoor unit sets on the agreed pad or brackets.
- Make up servicesElectrical connections and condensate follow the site walk. Non standard electrical is already quoted if it came up.
- Start and leave cleanSystem is started and operation is checked. Floor is swept and debris leaves with the crew.
Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.
$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.
$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.
Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.
Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.
- Can I put $2,400 in the estimate today?
- Yes for a standard single zone mini split on a weekday, materials and labor. Use $2,600 if you are bidding a weekend date. Anything outside standard is quoted before work begins, so you are not eating a surprise on the job.
- How do I schedule around drywall and paint?
- Tell us where you are in the sequence when you call (512) 297-7493. After drywall is a common slot for the indoor unit. The date you pick is the date we work from once it is confirmed.
- Do you pull the Temple permit?
- No. Requirements vary by jurisdiction. Jester Climate is not a permitting authority. Confirming permits is on the owner or the general contractor.
- What is the joker day?
- The joker day moves week to week. See the home page for the current day. Price sits under the weekday rate.
- What if the outdoor location is tight on a Temple lot?
- Routing, mounting, and penetrations are confirmed at the site walk. If the layout is not standard, it is quoted before any work begins. Do not assume the $2,400 still holds until that walk is done.
One number, one call, one line item in Temple, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.