Mini split work for Georgetown remodel and conversion crews
You are adding a conditioned room the main system was never sized for. Plug $2,400 into the bid for a weekday single zone mini split, materials and labor. Call (512) 297-7493 and get that number on the estimate today.
| Standard single zone install, weekday | $2,400 materials and labor |
|---|---|
| Same install, Saturday or Sunday | $2,600 materials and labor |
| Joker day | One day each week priced under the weekday rate, day shown on the home page |
| Booking deposit | $400 toward materials |
| Balance | Due on completion |
| Non standard work | Quoted before any work begins |
| Bid line item | Single zone mini split, weekday, materials and labor $2,400 |
| Note | Standard: indoor unit, outdoor unit, line set, drain, labor |
| Note | Site walk confirms size, circuit, drain, penetrations |
| Note | Single POC: Jester Climate, (512) 297-7493 |
| Scope confirmed | At the site walk |
| Contact | (512) 297-7493 |
The number you plug into the bid today
Standard single zone mini split installation is $2,400 on weekdays, materials and labor. Weekend work is $2,600. One joker day each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page.
Book with a $400 materials deposit. The rest is the completion balance. Weekend and weekday rates do not change that split.
- $2,400 weekday, materials and labor
- $2,600 weekend, materials and labor
- Joker day posted on the home page, lower than weekday
- $400 materials deposit to book
You pick the date; it gets confirmed
You pick the date. It gets confirmed. If anything changes you get told. Call (512) 297-7493 to set it.
Name the day the drywall crew leaves if that is the day you want. State it on the call. Georgetown conversion jobs use the same weekday and weekend numbers as the rest of the corridor.
Garage conversions and extra rooms
A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site as a rule of thumb, then checked at the site walk.
Line set length, circuit size, drain routing, penetration location and equipment size are all confirmed at the site walk. Do not guess those in your bid notes. Call if the room is not a simple single zone and get a quote before work begins.
Walkthrough without looking sloppy
The indoor unit is on the wall. The outdoor unit is set. Line set and drain are in place. Penetrations are closed.
Your client should see a finished mechanical install, not open copper and packing. If they ask who did the mechanical, the name is Jester Climate and the number is (512) 297-7493.
One line item, one phone call
The bid line is a standard single zone mini split. Use $2,400 for a weekday. Use $2,600 for a weekend.
Call (512) 297-7493 to set up repeat scheduling. Service area is Austin and the I-35 corridor. Georgetown conversion work is in that area.
Permits are not in this line item
Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.
Put permit cost and filing on the owner or GC side of the estimate. The $2,400 weekday number is install materials and labor only. Ask at the site walk if the job has conditions that take it out of standard.
Included in the number
- Indoor unit installed on the wall confirmed at the site walk
- Outdoor unit set at the location confirmed at the site walk
- Line set run on the routing confirmed at the site walk
- Condensate drain on the routing confirmed at the site walk
- Cable between indoor and outdoor units
- Penetration at the location confirmed at the site walk
- System start
- Labor in the weekday $2,400 or weekend $2,600 figure
Quoted before work begins
- Additional zones
- Condensate pump
- Electrical work beyond a standard hookup
- Non standard line set or drain routing
- Finish work beyond the penetration
- Outdoor placement outside what the site walk called standard
Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.
- Complete the site walk
- Clear the indoor wall
- Clear the outdoor location
- Leave a path for materials
- Provide panel access
- Book with a $400 materials deposit
- Confirm the date at (512) 297-7493
- Confirm layoutThe wall and the outdoor spot are checked against the site walk. If it is no longer standard, it is quoted before work begins.
- Indoor unitIndoor unit goes on the wall confirmed at the site walk. Penetration location is the one already confirmed.
- Outdoor unitOutdoor unit is set at the confirmed location. Circuit size is the one confirmed at the site walk.
- Line set and drainLine set and drain are run on the routing confirmed at the site walk. Non standard routing is not started without a quote.
- Start and GC checkSystem is started. GC can walk the indoor wall, the outdoor unit, and the penetrations before the crew leaves.
Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.
$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.
$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.
Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.
Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.
- Can I put $2,400 on a Georgetown conversion bid today?
- If the job is a standard single zone mini split on a weekday, yes. That figure is materials and labor. Weekend work is $2,600. Get a quote first if the room is not a standard single zone.
- How do I set the date around drywall?
- You pick the date. It gets confirmed. If anything changes you get told. Call (512) 297-7493.
- Is the permit inside the $2,400?
- No. That number is install materials and labor. Permits are not part of the line item. Confirming permit needs is on the owner or the general contractor.
- What knocks a job off the $2,400 weekday price?
- Extra zones, a condensate pump, and electrical work beyond a standard hookup are common. Non standard routing is another. All of it is quoted before any work begins. Confirm those at the site walk.
- When is the rest of the money due?
- Balance is due on completion. The $400 materials deposit is what books the job. Non standard work is quoted before any work begins so the completion balance is known.
One number, one call, one line item in Georgetown, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.