Jester ClimateBuilder sheet (512) 297-7493
Sheet B-067 / ADU and Casita Builders Rev A / Austin and I-35 corridor
Local Sub Coverage

Mini Split Install for ADU Builders in Temple

You are framing a casita in Temple. You need a mini split line item you can plug into a bid today. Jester Climate gives you a flat number, a confirmed date, and a clean install that does not make you look bad at walkthrough.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split install, materials and labor: $2,400 (weekday) / $2,600 (weekend)
NoteStandard install includes equipment, line set, and electrical to panel.
NoteSite walk confirms line set length, circuit size, and drain routing.
NoteContact (512) 297-7493 for scheduling and repeat work.
Scope confirmedAt the site walk
Contact(512) 297-7493

Flat Pricing, No Surprises

One number for the bid. $2,400 weekdays, $2,600 weekends. Materials and labor included.

Deposit of $400 books the date. Balance due on completion. Non standard work quoted before any work begins.

  • Weekday install: $2,400 materials and labor
  • Weekend install: $2,600 materials and labor
  • Deposit of $400 books the date
  • Balance due on completion

Scheduling That Holds

You pick the date that works for your build schedule. That date gets confirmed.

If something changes on your end, you get told. No surprises on the timeline.

What a Standard Install Covers

Standard single zone mini split install includes equipment, line set, and electrical hookup to the panel.

The crew handles the full installation. The system is tested before we leave. We clean up the workspace.

Non Standard Work Is Quoted First

Some jobs require extra work. That might include longer line sets, additional electrical work, or structural modifications.

We quote that work before any work begins. You approve the quote before we proceed. No surprise charges.

What You Leave Ready

Before the install crew arrives, the jobsite needs to be ready. The wall penetrations should be marked. The electrical panel should be accessible.

The area around the install location should be clear. Our prep checklist covers the details.

Repeat Scheduling for Multiple Jobs

If you have multiple ADUs or casitas, one phone call sets up repeat scheduling across projects.

Call (512) 297-7493 to discuss your build pipeline. We work with builders throughout Temple and the I-35 corridor.

Scope of workStandard single zone install

Included in the number

  • Indoor unit and mounting hardware
  • Outdoor condenser and pad
  • Line set (length confirmed at site walk)
  • Electrical whip and disconnect
  • Line set cover (if needed)
  • System testing and startup
  • Worksite cleanup

Quoted before work begins

  • Additional electrical subpanel or breaker
  • Line set length beyond standard run (confirmed at site walk)
  • Structural modifications (e.g., cutting beams)
  • Custom drain routing
  • Condensate pump installation
  • Wall or roof penetration repair
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Access to electrical panel with available breaker slot
  • Clear path for line set routing
  • Wall penetration location marked
  • Area around install location free of debris
  • Power available for testing
  • Confirm indoor unit location with client
Install dayPhase order, no clock times promised
  • Arrival and SetupThe crew arrives with all equipment. They review the site walk notes and set up the workspace.
  • Line Set InstallationThe line set is run between the indoor and outdoor locations. The route is confirmed from the site walk.
  • Electrical ConnectionThe electrical whip is connected to the panel. The disconnect is installed per code.
  • Indoor and Outdoor Unit MountingThe indoor unit is mounted on the wall bracket. The outdoor unit is placed on the pad and secured.
  • System Test and CleanupThe system is tested for cooling and heating operation. The crew cleans up the jobsite before leaving.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
What is the deposit and when is it due?
$400 materials deposit to book the date. Balance due on completion. No other fees.
What if I need the install on a weekend?
Weekend install is $2,600. Same deposit and balance terms. Call to schedule.
How do I schedule repeat work for multiple units?
Call (512) 297-7493 to set up repeat scheduling across your projects. One number for all your ADUs and casitas.
What is included in the standard install?
Equipment, line set, and electrical hookup to the panel. Line set length and circuit size confirmed at site walk.
What if the site needs extra work?
Non standard work is quoted before any work begins. You approve the quote first. No extra charges without approval.
Related builder sheets
Book it

One number, one call, one line item in Temple, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493