Jester ClimateBuilder sheet (512) 297-7493
Sheet B-015 / Garage Conversion Crews Rev A / Austin and I-35 corridor
Electrical Rough In

What the electrician leaves ready for a garage mini split

Ductwork does not extend into a garage conversion. Standard single zone mini split install is $2,400 on weekdays, materials and labor; $2,600 on weekends. The electrician leaves the circuit, disconnect, whip and conduit ready; the rest is confirmed at the site walk.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split, materials and labor, weekday $2,400 / weekend $2,600
NoteStandard single zone: materials and labor included
NoteSite walk confirms circuit, drain, penetration, size
NotePoint of contact is (512) 297-7493, Jester Climate
Scope confirmedAt the site walk
Contact(512) 297-7493

What the electrician leaves ready

The electrician runs a dedicated circuit to the outdoor unit location. A disconnect sits at that location. Whip and conduit are left with that disconnect. Circuit size is confirmed at the site walk.

Do not pull the circuit to a catalog guess. Indoor head location and outdoor location get set before wire is pulled. If those leave behinds are missing, the electrical portion is quoted before work begins.

  • Dedicated circuit to the outdoor unit location
  • Disconnect next to the outdoor unit location
  • Whip and conduit left for the outdoor unit
  • Penetration location confirmed at the site walk

What the coordination call covers

A coordination call between the GC, the electrician and the installer covers the dedicated circuit, the disconnect, whip and conduit, and where the penetration wants to be. Indoor head wall and outdoor unit location get agreed on that call. Drain routing is confirmed at the site walk.

Permit duty sits with the owner or the GC. Rules change by city and county. Jester Climate is not a permitting authority.

Where the penetration wants to be

The hole wants a direct path from the indoor head to the outdoor unit. Line set length is confirmed at the site walk. Drain routing is confirmed at the site walk. Equipment size is confirmed at the site walk.

The wall is cut after the site walk confirms the hole. A garage firewall, a finished exterior or a slab edge can move that hole. Mark the penetration after the GC, the electrician and the installer agree.

The number that goes in the bid

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. It is $2,600 on weekends. A $400 materials deposit books the date. Balance is due on completion.

One Joker Day each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page. Non standard work is quoted before any work begins.

Garage load is not the floor plan

A converted garage reads smaller than it loads. West glass and a hot attic push the size up. A casita reads smaller than it loads too. The size gets confirmed on site.

Do not pick equipment off a floor plan. Insulation, air sealing and glass change the load. Sizing is a rule of thumb confirmed on site.

How the date gets set

You pick the date. It gets confirmed. If anything changes, you get told. Call (512) 297-7493.

Service area is Austin and the I-35 corridor. Weekend work is $2,600. Joker Day pricing is on the home page.

Scope of workStandard single zone install

Included in the number

  • Indoor unit mounted at the location agreed on site
  • Outdoor unit set at the location agreed on site
  • Line set run through the penetration confirmed at the site walk
  • Communication wire pulled with the line set
  • Condensate drain on the routing confirmed at the site walk
  • Outdoor unit connected to the disconnect and whip left by the electrician
  • Startup of the single zone system
  • Materials and labor for that standard single zone

Quoted before work begins

  • Extra zones beyond a single zone
  • Condensate pump
  • Line set routing that is not a direct wall penetration
  • Electrical work when circuit, disconnect, whip or conduit were not left ready
  • Concealment, chase or soffit work
  • Cutting that is not a standard wall penetration
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Dedicated circuit at the outdoor unit location
  • Disconnect mounted near the outdoor unit location
  • Whip and conduit left ready
  • Indoor wall ready for the head
  • Outdoor location clear and reachable
  • Access through the job for indoor and outdoor work
Install dayPhase order, no clock times promised
  • Site confirmPenetration, drain routing, circuit landing and equipment size are confirmed before the wall is opened.
  • Indoor headThe indoor unit mounts on the wall confirmed at the site walk. Keep that wall clear.
  • Outdoor unitThe outdoor unit sets at the agreed location. It lands on the whip and disconnect the electrician left.
  • Line set and drainLine set and communication wire run the confirmed path. Drain follows the routing confirmed at the site walk.
  • StartupThe single zone system is started. The GC gets a look at indoor head, outdoor unit, disconnect landing and drain.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Who runs the dedicated circuit?
Your electrician. Jester Climate lands the outdoor unit on the disconnect and whip that were left ready. Circuit size is confirmed at the site walk. Missing leave behinds get quoted before work begins.
Where does the disconnect go?
Near the outdoor unit location. Exact placement is confirmed at the site walk. Whip and conduit are left there so the installer can land the unit.
Do you pull permits?
No. Requirements vary by jurisdiction. Confirming the permit is on the owner or the general contractor.
What books the date?
A $400 materials deposit. Balance is due on completion. Weekday work is $2,400. Weekend work is $2,600.
Can we use you on every garage conversion?
Call (512) 297-7493 to set up repeat scheduling. Service area is Austin and the I-35 corridor. Use the same bid line each time.
Related builder sheets
Book it

One number, one call, one line item along the Austin and I-35 corridor. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493