Jester ClimateBuilder sheet (512) 297-7493
Sheet B-057 / General Contractors Rev A / Austin and I-35 corridor
Local Sub Coverage

Temple mini split sub: one number, one call, next job

Temple jobs take a $2,400 weekday line for a standard single zone mini split, materials and labor. Weekend work is $2,600. You pick the date, it gets confirmed, and if anything changes you get told.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split, std install, materials and labor: $2,400 weekday / $2,600 weekend
NoteStandard single zone: $2,400 weekday, $2,600 weekend
NoteLine set, circuit, drain, and size confirmed at site walk
NotePoint of contact: (512) 297-7493, Jester Climate
Scope confirmedAt the site walk
Contact(512) 297-7493

The number that goes in the bid

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. That is the figure to paste on Temple estimates that stay inside standard single zone scope.

$400 materials deposit to book. Balance is due on completion. Non standard work is quoted before any work begins. Leave extras off the bid until that quote exists.

  • $2,400 weekday, materials and labor
  • $2,600 on weekends
  • $400 materials deposit to book
  • Balance due on completion
  • Joker day listed on the home page

How the date gets on the calendar

Call (512) 297-7493 and name the date you want. The date gets confirmed.

If anything changes, you get told. Want the crew after drywall is down, name that date. Do not run other trades against a slot that was never confirmed.

Site walk before you lock extras

A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.

Line set length, circuit size, drain routing, penetration location and equipment size are all confirmed at the site walk. If the path or the circuit is not standard, it is quoted before any work begins.

Walkthrough is your client, not ours

The owner looks at the head on the wall, the line cover, the penetration, and the outdoor unit. That is what they score when they walk the house with you.

If the wall, the drain path, or the pad location is a problem, flag it at the site walk. Finish gets set there. You do not want that conversation in front of the buyer.

Temple sits on the I-35 corridor

Service area is Austin and the I-35 corridor. Temple is on that corridor.

Call (512) 297-7493 to set up repeat scheduling. Keep the same bid line on the next job. Non standard scope on a later address is still quoted before any work begins.

Joker day, weekday, weekend

Weekday rate is $2,400. Weekend rate is $2,600. One JOKER DAY each week is priced lower than the weekday rate.

Which day it lands on changes week to week. It is revealed on the home page. Check the home page, then call (512) 297-7493 to book.

Scope of workStandard single zone install

Included in the number

  • Indoor wall unit mounted at the location confirmed at the site walk
  • Outdoor unit set at the location confirmed at the site walk
  • Refrigerant line set installed on the path confirmed at the site walk
  • Condensate drain installed on the path confirmed at the site walk
  • Control cable run between indoor and outdoor units
  • Electrical connection to the circuit confirmed at the site walk
  • Wall penetration made and covered
  • System started and basic operation checked

Quoted before work begins

  • Added indoor units on the same job
  • New circuit or panel work
  • Condensate pump or a drain that is not gravity
  • Outdoor placement that needs a wall bracket, stand, or roof set
  • Line path that is not a simple exterior run
  • Any other item that is not a standard single zone install
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Clear access to the indoor wall and the outdoor location
  • Power on at the panel
  • Circuit in place, or flagged so it can be quoted before work begins
  • Wall surface ready for the indoor unit
  • Permit in hand if the jurisdiction requires one; that is on the owner or the GC
  • Superintendent reachable on install day
  • Path kept clear for moving the outdoor unit
Install dayPhase order, no clock times promised
  • Site confirmCrew checks in with the superintendent. Indoor location, outdoor location, penetration, and drain path get confirmed against the site walk.
  • Indoor mountHead goes on the wall at the agreed location. Penetration is cut and covered.
  • Outdoor and linesCondenser is set. Line set and control cable are run on the path confirmed at the site walk.
  • Drain and powerDrain is run. Electrical connection is made to the circuit confirmed at the site walk.
  • Start and handoffSystem is started. Basic operation is checked with the superintendent before the crew leaves.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Can I put $2,400 in a Temple bid today?
Use $2,400 for a standard single zone mini split on a weekday, materials and labor. Use $2,600 if the work falls on a weekend. If the site walk shows extra circuit, drain, or line path work, that portion is quoted before any work begins. Do not bake a guess into the bid.
Who pulls the permit in Temple?
Requirements vary by jurisdiction. Jester Climate is not a permitting authority. Confirming the permit is on the owner or the general contractor. Flag permit status when you call (512) 297-7493.
What if I need you the day drywall is done?
Name that date when you call. The date gets confirmed. If anything on our side changes, you get told. Sequence the other trades after you have the confirmation, not before.
How do I keep you as the mini split sub across jobs?
Call (512) 297-7493 to set up repeat scheduling. Bring the next address and the date you want. Use the standard single zone figure unless the site walk changes the scope.
What is the joker day?
One JOKER DAY each week is priced lower than the weekday rate. The day changes week to week. It is revealed on the home page. Check there, then call (512) 297-7493.
Related builder sheets
Book it

One number, one call, one line item in Temple, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493