Mini split sub for New Braunfels GCs
One number for your bid. One crew that shows up when drywall leaves. One clean install the client sees at walkthrough. Repeat it across jobs.
| Standard single zone install, weekday | $2,400 materials and labor |
|---|---|
| Same install, Saturday or Sunday | $2,600 materials and labor |
| Joker day | One day each week priced under the weekday rate, day shown on the home page |
| Booking deposit | $400 toward materials |
| Balance | Due on completion |
| Non standard work | Quoted before any work begins |
| Bid line item | Mini split install, single zone, standard scope: $2,400 |
| Note | Standard scope covers one indoor unit, one outdoor unit, line set, circuit, drain |
| Note | Site walk confirms equipment size, line set length, penetration location, drain routing |
| Note | Point of contact is the crew lead on install day |
| Scope confirmed | At the site walk |
| Contact | (512) 297-7493 |
The number for your bid
Standard single zone mini split install is $2,400 on weekdays. $2,600 on weekends. One JOKER DAY each week is priced lower; check the home page for which day.
Non standard work is quoted before any work begins. You know the cost up front.
How scheduling works
You pick the date. It gets confirmed. If anything changes, you get told.
Weekday installs book first. Weekend slots are available at the weekend rate.
- No drywall crew on site? We don't show up.
- No last minute surprises on your timeline.
- One call, one date, one crew.
What a standard install covers
One indoor unit, one outdoor unit, line set, circuit, drain. Equipment size is confirmed on site; a casita reads smaller than it loads, west glass and a hot attic push the size up.
The crew leaves the install ready for walkthrough. No punch list, no call backs.
What triggers a quote
Non standard work is quoted before any work begins. You know the cost up front, no surprises on the invoice.
If the site walk shows something outside standard scope, you get a quote before the crew arrives.
- Additional line set length
- Non standard drain routing
- Non standard circuit size
- Non standard penetration location
- Additional equipment
What you leave ready
The crew needs clear access to the install area. No debris, no stored materials, no trades in the way.
Power must be available at the circuit location. No extension cords, no temporary power.
- Drywall complete, no texture or paint needed
- No other trades scheduled in the install area
- No stored materials or debris in the install area
- Power available at the circuit location
- Clear access to the outdoor unit location
Repeat it across jobs
One call, one line item, one crew. Set up repeat scheduling for your jobs in New Braunfels.
Call (512) 297-7493 to set up repeat scheduling.
Included in the number
- One indoor unit mounted and connected
- One outdoor unit placed and connected
- Line set routed and insulated
- Circuit installed and powered
- Drain line routed and connected
- Equipment size confirmed on site
- Penetration sealed and weatherproofed
- System started and tested
Quoted before work begins
- Additional line set length beyond standard scope
- Non standard drain routing
- Non standard circuit size or location
- Non standard penetration location
- Additional equipment or zones
Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.
- Drywall complete in the install area
- No other trades scheduled in the install area
- No stored materials or debris in the install area
- Power available at the circuit location
- Clear access to the outdoor unit location
- No texture or paint needed before install
- No temporary power or extension cords
- ArrivalCrew arrives at the scheduled time. Site walk confirms scope and equipment size.
- Indoor unitUnit is mounted, line set and drain are routed. Penetration is sealed.
- Outdoor unitUnit is placed, line set and circuit are connected. System is pressurized.
- StartupSystem is started, tested, and balanced. Crew walks the install with you.
- CompletionBalance is due. Crew cleans up and leaves the site ready for walkthrough.
Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.
$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.
$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.
Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.
Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.
- What's the deposit to book?
- A $400 materials deposit books the install. The balance is due on completion. Non standard work is quoted before any work begins, so you know the full cost up front.
- How do I know if my job is standard scope?
- Standard scope covers one indoor unit, one outdoor unit, line set, circuit, and drain. The site walk confirms equipment size, line set length, penetration location, and drain routing. If anything falls outside standard scope, you get a quote before work begins.
- What if the install day changes?
- You pick the date, it gets confirmed. If anything changes, you get told. There are no last minute surprises on your timeline.
- Who do I call for repeat scheduling?
- Call (512) 297-7493 to set up repeat scheduling for your jobs in New Braunfels. One call, one line item, one crew.
- What if the client wants changes after the install starts?
- Any changes after the site walk require a new quote. The crew stops work until the change is confirmed and priced. You know the cost before any additional work begins.
One number, one call, one line item in New Braunfels, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.