Jester ClimateBuilder sheet (512) 297-7493
Sheet B-002 / General Contractors Rev A / Austin and I-35 corridor
Scheduling

Pick the date. $2,400 weekday. One phone call.

Standard single zone mini split install is $2,400 on weekdays, materials and labor. Weekends are $2,600. $400 books the date after you call (512) 297-7493.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split install, matl and labor: $2,400 weekday, $2,600 weekend
NoteStandard single zone: $2,400 weekday, $2,600 weekend
NoteSize, line set, drain, circuit: confirmed at site walk
NoteScheduler: Jester Climate, (512) 297-7493
Scope confirmedAt the site walk
Contact(512) 297-7493

The number that goes in the bid

Standard single zone mini split installation is $2,400 on weekdays. That figure is materials and labor. Weekends are $2,600.

Non standard work is quoted before any work begins. Plug the weekday number if the date is a weekday. Plug the weekend number if you need Saturday or Sunday.

How the date gets booked

Call (512) 297-7493 with the job address and the date you want. Service area is Austin and the I-35 corridor. The $400 materials deposit books that date. Balance is due on completion.

You pick the date. It gets confirmed. If anything changes, you get told.

Call before the drywall crew leaves

Penetrations, line set routing, drain routing, and indoor location are easier to set while the wall is still open. After drywall, those items become non standard more often. Quote those items before the crew starts.

Size is a rule of thumb confirmed on site. A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.

If the site is not ready

Call (512) 297-7493 if the site will not be ready. Pick another date. That date gets confirmed.

Prep is on the GC. A closed wall, a blocked outdoor location, or no path from the truck is a site condition. Those conditions are confirmed at the site walk. Out of scope work gets a quote first.

Weekday, weekend, and the joker day

Use the weekday rate when the other trades leave a Monday through Friday opening. Use the weekend rate when you need Saturday or Sunday. Weekday standard single zone mini split is $2,400. Weekend is $2,600.

One JOKER DAY each week is priced lower than the weekday rate. Which day it lands on changes week to week. It is revealed on the home page. Call (512) 297-7493 if that day fits the job.

One sub across the jobs you are running

Jester Climate is the name on the line item. The phone is (512) 297-7493. Service covers Austin and the I-35 corridor.

Call (512) 297-7493 to set up repeat scheduling. The weekday number stays $2,400. The deposit stays $400.

Scope of workStandard single zone install

Included in the number

  • Indoor wall mount unit
  • Outdoor unit, placement confirmed at the site walk
  • Line set, routing confirmed at the site walk
  • Condensate drain, routing confirmed at the site walk
  • Circuit, confirmed at the site walk
  • Wall penetration, location confirmed at the site walk
  • Startup and indoor control

Quoted before work begins

  • Extra zones or extra indoor units
  • Concealed or ducted indoor units
  • Electrical work beyond the standard circuit
  • Condensate pump or non standard drain routing
  • Non standard line set routing
  • Penetrations through finished walls, concrete, or stone
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Indoor wall still open at the unit location
  • Outdoor location clear, with a path from the street
  • Electrical panel accessible
  • Gate code or keys with the on site contact
  • Superintendent phone number left with the scheduler
  • Other trades off the indoor wall and the outdoor location
Install dayPhase order, no clock times promised
  • Date checkYou already picked the date. It is confirmed before the crew rolls. If the date moves, you get told.
  • Site walkLine set routing, drain routing, penetration location, circuit, and equipment size are confirmed at the site walk. Anything outside standard scope is priced in writing first.
  • Set indoor and outdoorIndoor location and outdoor location follow what the site walk confirmed. Mounting method is confirmed at the site walk.
  • Line set, drain, circuitLine set, drain, and circuit are run as confirmed at the site walk. Finished walls, odd routing, or extra electrical are not standard.
  • Start and handoffThe unit is started. Indoor control is left with the superintendent or GC on site. Balance is due on completion.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Can I put $2,400 in the bid today?
Yes, for a standard single zone mini split install on a weekday, materials and labor. Use $2,600 if the date has to be a weekend. Size, line set, drain, and circuit are confirmed at the site walk.
What do I need on the call to book?
Have the job address, the indoor location, and the date you want. $400 materials deposit books the date. Balance is due on completion.
What sits outside the $2,400?
Additional zones, concealed indoor units, drain pumps, non standard line set routing, and electrical work beyond the standard circuit. Line set, circuit, drain, penetration, and size are confirmed at the site walk.
Do you pull the permit?
No. Requirements vary by jurisdiction. Jester Climate is not a permitting authority. Confirming the permit is on the owner or the general contractor.
Can I buy a Saturday to keep the sequence?
Weekend rate is $2,600 for a standard single zone mini split install, materials and labor. Use that when a weekday date does not fit the other trades. One JOKER DAY each week is priced lower than the weekday rate and is posted on the home page.
Related builder sheets
Book it

One number, one call, one line item along the Austin and I-35 corridor. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493