Jester ClimateBuilder sheet (512) 297-7493
Sheet B-023 / House Flippers Rev A / Austin and I-35 corridor
Scope of Work

Standard single zone mini split, scoped for the bid

A flip crew needs a cooling line item priced before the offer and installed before photos. Standard single zone mini split installation is $2,400 on weekdays, materials and labor. Weekend rate is $2,600.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split install, weekday, materials and labor, $2,400
NoteStandard: one indoor, one outdoor, one interconnect
NoteSite walk confirms routing, circuit, and size
NoteContact: (512) 297-7493, GC or owner on site
Scope confirmedAt the site walk
Contact(512) 297-7493

What $2,400 includes on weekdays

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. The figure is one indoor unit, one outdoor unit, and the connecting work confirmed at the site walk.

Weekend rate is $2,600. One JOKER DAY each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page.

Non standard work

Non standard work is quoted before any work begins. Extra heads, extra outdoor units, pumps, panel work, and non standard mounts sit in that bucket.

The $2,400 weekday number does not absorb those items. Quote first. Then work.

Who pulls what

Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.

Electrical circuit, drain routing, penetration location, and equipment size are confirmed at the site walk. The builder owns access, trade order, and what the city asked for.

Division of work for the exhibit

This block is written to paste into a subcontract exhibit. Jester Climate furnishes the standard single zone mini split install described in the included list.

The builder furnishes a ready site, an on site contact, and a decision on any quoted extra. Disputes get settled against this scope, not against memory at walkthrough.

  • Jester Climate: standard single zone materials and labor
  • Builder: marked locations and a clear run path
  • Builder: power on and panel access
  • Owner or GC: permit status
  • Both: site walk before work
  • Jester Climate: quote extras before they start

Book the date

$400 materials deposit to book. Balance due on completion. Call (512) 297-7493.

You pick the date. It gets confirmed. If anything changes you get told.

Austin work and the next flip

Service area is Austin and the I-35 corridor. Use the weekday number on a standard single zone. Use the weekend number on a weekend.

Keep this page as the exhibit. The line item stays the same from property to property when the scope stays standard.

Scope of workStandard single zone install

Included in the number

  • One indoor head at the location confirmed at the site walk
  • One outdoor condenser on a standard pad or wall bracket
  • Line set run between indoor and outdoor, routing confirmed at the site walk
  • Condensate drain, routing confirmed at the site walk
  • Penetration at the location confirmed at the site walk
  • Electrical tie in to the circuit confirmed at the site walk
  • Startup and operation check
  • Removal of install packaging and scrap

Quoted before work begins

  • Extra indoor heads or an extra outdoor unit
  • Condensate pump
  • Panel work
  • Roof mount or custom stand
  • Relocation of existing equipment
  • Finish work beyond the penetration, including wall repair the buyer will see
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Indoor wall and outdoor spot marked
  • Run path clear of material piles and other trades
  • Power on at the panel
  • Truck access to the outdoor location
  • On site contact with keys
  • Owner or GC knows permit status
Install dayPhase order, no clock times promised
  • ConfirmOn site contact walks indoor and outdoor locations with the crew. Line set routing, drain routing, penetration location, circuit, and equipment size are confirmed at the site walk.
  • SetIndoor head goes on the marked wall. Outdoor unit goes on the standard pad or wall bracket confirmed at the site walk.
  • RunLine set, drain, and electrical follow the confirmed routing. Penetration is made at the confirmed location.
  • StartUnit is started and operation is checked with the on site contact.
  • CloseBalance is due on completion. The exhibit scope is what was installed.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Can I plug $2,400 into the bid today?
Yes, for a standard single zone mini split on a weekday, materials and labor. Weekend work is $2,600. If the site walk shows extras, you get a quote before those extras start.
How is the unit sized?
Sizing is a rule of thumb confirmed on site. A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.
Do you pull the permit?
Permit duty sits with the owner or the general contractor. Bring the city requirement to the site walk. The install follows the exhibit, not the permit counter.
What should be ready when the crew arrives?
Locations marked, path open, power on, contact on site with keys. If the indoor wall is closed, say so when you book so the penetration can be planned at the site walk. Other trades off the work path.
How do I run this on every flip?
Call (512) 297-7493 to set up repeat scheduling. Paste the line item into each estimate. Keep non standard items on a separate quote line.
Related builder sheets
Book it

One number, one call, one line item along the Austin and I-35 corridor. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493