Build Sequence

After drywall, before paint: the mini split slot

Standard single zone mini split installation is $2,400 on weekdays, materials and labor; $2,600 on weekends. Slot it after drywall and before paint so electrical, insulation, and board are done, and paint, flooring, and trim are not. Call (512) 297-7493.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemSingle zone mini split, standard $2,400 weekday / $2,600 weekend
NoteStandard single zone: mount, set, line set, drain, start
NoteSite walk confirms size, circuit, drain, penetration
NotePoint of contact: Jester Climate (512) 297-7493
Scope confirmedAt the site walk
Contact(512) 297-7493

The slot: after drywall, before paint

Rough electrical and insulation come first. Drywall closes the walls. The indoor unit mounts on finished drywall, before paint.

Paint, flooring, and trim follow the install. The walkthrough is last. Slot it there and you do not recut board or paint around a head that was not there.

  • Rough electrical complete
  • Insulation in, chase left open
  • Drywall hung and mudded
  • Mini split
  • Paint
  • Flooring, trim, walkthrough

What breaks when you slot it too early

If the indoor unit goes on open studs, drywall has to work around it. The head gets coated, dinged, or boxed in. Line sets left in the bay get covered with no chase and no cover path.

Insulation crews will bury a drain left loose in the bay. You then open finished walls to find it. An outdoor unit set before final grade gets moved twice.

What breaks when you slot it too late

After paint, you cut a finished wall for the line set and the head. Touch-up never matches. Flooring then works around a pad and a drip path you could have set on subfloor.

Trim that closes a chase you still need gets pulled. At walkthrough the owner sees a cut, a patch, and a cover that was not on the sheet. Slot the unit before paint so that conversation does not happen.

What each trade leaves for the install

Electrical leaves a circuit path and a disconnect location. Circuit size is confirmed at the site walk. Do not share that run with lighting or receptacles.

Insulation leaves the chase open and the penetration bay unfaced. Drywall hangs the board, muds, and sands. Leave the indoor wall clear of furniture and staging. Paint, flooring, and trim stay off the head location, the cover path, and the outdoor pad.

  • Electrical: circuit path and disconnect location marked
  • Insulation: chase and penetration bay left open
  • Drywall: board hung, mudded, wall clear
  • Paint held until the head is mounted
  • Flooring and trim: pad and drip path left open

The number you carry, and what the walk confirms

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. $2,600 on weekends. That is the line item you carry from design through construction. Non standard work is quoted before any work begins.

A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site. Line set length, circuit size, drain routing, penetration location and equipment size are all confirmed at the site walk.

How the date gets on the calendar

You pick the date. It gets confirmed. If anything changes, you get told.

$400 materials deposit to book. Balance due on completion. Service area is Austin and the I-35 corridor. Call (512) 297-7493 to set up repeat scheduling.

Scope of workStandard single zone install

Included in the number

  • One indoor head mount on finished drywall
  • One outdoor unit set at the location confirmed at the site walk
  • Line set on a standard exterior run; length confirmed at the site walk
  • Electrical tie-in to the path left by rough; circuit size confirmed at the site walk
  • Gravity condensate drain; routing confirmed at the site walk
  • Wall penetration; location confirmed at the site walk
  • Start up
  • Materials and labor for a standard single zone

Quoted before work begins

  • Additional indoor heads or extra zones
  • Line set routing that is not a standard exterior run
  • Drain work when a gravity path is not available
  • Circuit work when rough electrical left no path
  • Finish repair when drywall or paint is already closed
  • Indoor or outdoor relocate after the site walk
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Rough electrical path and disconnect location left in place
  • Insulation chase and penetration bay left open
  • Drywall hung and mudded on the indoor wall
  • Indoor wall clear of staging and stored material
  • Outdoor set location clear and reachable
  • Paint, flooring, and trim held off the head, cover, and pad
  • GC reachable on the date you picked
Install dayPhase order, no clock times promised
  • ConfirmCrew checks the indoor wall, outdoor location, drain path, and circuit path against what the site walk already confirmed.
  • OutdoorOutdoor unit is set. Pad location was confirmed at the site walk.
  • IndoorIndoor head mounts on the finished drywall. Penetration location was confirmed at the site walk.
  • ConnectLine set, drain, and electrical are tied in. Length, routing, and circuit size were confirmed at the site walk.
  • StartUnit is started. Balance is due on completion.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
Can I plug $2,400 into the bid today?
Yes. Use $2,400 for a weekday standard single zone, materials and labor. Use $2,600 if the date you pick is a weekend.
When do I schedule you against drywall?
Call (512) 297-7493 when drywall is scheduled. Book after the board is hung and mudded, before paint. The indoor wall should be clear when the crew arrives.
Who is responsible for the permit?
Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.
How do you size a casita or an office?
Sizing is a rule of thumb confirmed on site. A small room with west glass is not a small load. Equipment size is confirmed at the site walk.
What is Joker Day versus the weekend rate?
Weekends are $2,600. One JOKER DAY each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page.
Related builder sheets
Book it

One number, one call, one line item along the Austin and I-35 corridor. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493