Jester ClimateBuilder sheet (512) 297-7493
Sheet B-056 / General Contractors Rev A / Austin and I-35 corridor
Local Sub Coverage

Mini split line item for San Marcos builders

You need a mini split number for San Marcos bids today. Standard single zone is $2,400 on weekdays, materials and labor. Weekends are $2,600.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemStd single zone mini split install, mat and labor: $2,400 weekday / $2,600 weekend
NoteStd single zone: indoor, outdoor, line set, drain, start up
NoteSite walk confirms size, circuit, drain, penetrations
NotePoint of contact: Jester Climate (512) 297-7493
Scope confirmedAt the site walk
Contact(512) 297-7493

The bid number for San Marcos jobs

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. Weekends are $2,600. Put that number in the estimate today.

One Joker Day each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page. Call (512) 297-7493 if the scope is not a standard single zone.

  • $2,400 weekday, materials and labor
  • $2,600 weekend, materials and labor
  • Joker Day listed on the home page
  • $400 materials deposit to book

Scheduling on San Marcos jobs

Name the day that fits the other trades. Jester Climate confirms it. You are told if it moves.

Call (512) 297-7493 with the San Marcos address and the indoor and outdoor locations. Book it after drywall is up on that wall. Keep other trades off that wall.

What the site walk confirms

Line set routing, circuit size, drain routing, penetration location, and equipment size are confirmed at the site walk. Sizing starts as a rule of thumb. A casita reads smaller than it loads. West glass and a hot attic push the size up.

If the walk finds non standard work, it is quoted before any work begins. The $2,400 weekday number applies to a standard single zone only. Balance is due on completion.

Walkthrough in front of your client

The indoor unit is on the wall. The outdoor unit is set. The penetration is closed up. The remote is left for the owner.

If the owner is walking with you, they see a unit on the wall and an outdoor unit set. Hide kits and non standard mounts are quoted before work begins. Call (512) 297-7493 before that walk if the scope grew.

One call across your job list

Call (512) 297-7493 to set up repeat scheduling. The weekday number stays $2,400 for a standard single zone. The weekend number stays $2,600. Non standard work is still quoted before any work begins.

Service area is Austin and the I-35 corridor. San Marcos sits on that corridor. Point of contact is (512) 297-7493. The business name is Jester Climate.

Book the date from the job trailer

Call (512) 297-7493. $400 materials deposit books the date. Balance due on completion.

Have indoor and outdoor locations in mind before the site walk. Permits are not pulled by Jester Climate. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.

Scope of workStandard single zone install

Included in the number

  • Indoor unit mounted at the location agreed on the site walk
  • Outdoor unit set at the location agreed on the site walk
  • Line set installed; routing confirmed at the site walk
  • Condensate drain installed; routing confirmed at the site walk
  • Wall penetration and exterior seal
  • Interconnect between indoor and outdoor units
  • Start up and run check
  • Materials and labor for one standard single zone

Quoted before work begins

  • Additional indoor zones
  • New circuit from the panel
  • Condensate pump
  • Line hide or cover kit
  • Non standard pad, stand, or bracket
  • Move or reuse of existing equipment
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Site walk done, locations agreed
  • Drywall up on the indoor wall
  • Outdoor pad area clear
  • Path from truck to both locations open
  • Other trades off that wall
  • $400 materials deposit paid to book the date
  • GC or superintendent reachable by phone
Install dayPhase order, no clock times promised
  • ConfirmLocations are checked against the site walk before tools come off the truck.
  • IndoorThe indoor unit is mounted at the agreed wall.
  • OutdoorThe outdoor unit is set at the agreed location.
  • ConnectLine set, drain, and interconnect are run on the routing confirmed at the site walk.
  • Start upThe system is started. The GC can see it run. Balance is due on completion.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
What do I type in the estimate?
Type a standard single zone mini split install at $2,400 for a weekday. Type $2,600 if you are forcing a weekend. If you can flex, check the home page for the Joker Day that week.
How do I get a day on the calendar?
You pick the date. It gets confirmed. If anything changes, you get told. Call (512) 297-7493 with the address.
What knocks a job out of the $2,400 number?
A second zone, a new circuit from the panel, a condensate pump, line hide, or a non standard mount. Those items are quoted before any work begins. Size and routing still get confirmed at the site walk.
Who handles the San Marcos permit?
The owner or the general contractor. Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirm it before you set a closing with the client.
Is the $400 deposit the whole bill?
No. $400 is the materials deposit to book. Balance is due on completion. The weekday total for a standard single zone is $2,400.
Related builder sheets
Book it

One number, one call, one line item in San Marcos, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493