Jester ClimateBuilder sheet (512) 297-7493
Sheet B-053 / General Contractors Rev A / Austin and I-35 corridor
Local Sub Coverage

Mini split sub for Georgetown GCs: $2,400 weekdays

You need a mini split number you can drop into a Georgetown bid today. Standard single zone is $2,400 weekdays, materials and labor; $2,600 on weekends. $400 materials deposit books the date, balance due on completion.

Weekday install$2,400
Weekend install$2,600
Materials deposit$400
BalanceOn completion
Spec sheetScreenshot this for the bid folder
Standard single zone install, weekday$2,400 materials and labor
Same install, Saturday or Sunday$2,600 materials and labor
Joker dayOne day each week priced under the weekday rate, day shown on the home page
Booking deposit$400 toward materials
BalanceDue on completion
Non standard workQuoted before any work begins
Bid line itemMini split single zone, standard: $2,400 weekday / $2,600 weekend
NoteStandard single zone: $2,400 weekday, materials and labor
NoteLine set, circuit, drain, size: confirmed at site walk
NoteJester Climate, (512) 297-7493, Austin and I-35 corridor
Scope confirmedAt the site walk
Contact(512) 297-7493

The number you drop into the bid

Standard single zone mini split installation is $2,400 on weekdays, materials and labor. Weekend work is $2,600. One Joker Day each week is priced lower than the weekday rate. Which day it lands on changes week to week and is revealed on the home page.

Non standard work is quoted before any work begins. Jester Climate covers Austin and the I-35 corridor. Phone is (512) 297-7493.

  • $2,400 weekday, materials and labor, single zone
  • $2,600 weekend, same scope
  • Joker Day: lower than weekday; see home page for the day
  • $400 materials deposit to book
  • Balance due on completion
  • Non standard quoted before work begins

Pick the date, then get it confirmed

You pick the date. The date gets confirmed. If anything changes, you get told. Call (512) 297-7493 with the Georgetown address and the date you want.

Name the date that fits your sequence in Georgetown. It gets confirmed. If it changes, you get told.

  • You pick the date
  • The date gets confirmed
  • If anything changes, you get told
  • Call (512) 297-7493

Included versus quoted

The $2,400 weekday price is a standard single zone mini split installation, materials and labor. $2,600 is the weekend price for the same scope. Work outside that scope is non standard.

Sizing is a rule of thumb confirmed on site. A casita reads smaller than it loads. West glass and a hot attic push the size up. The size gets confirmed on site.

  • Line set length confirmed at the site walk
  • Circuit size confirmed at the site walk
  • Drain routing confirmed at the site walk
  • Penetration location confirmed at the site walk
  • Equipment size confirmed at the site walk

Walkthrough in front of your client

The indoor unit, the outdoor unit, and the penetrations are in front of the owner. They will ask you what they are looking at. Have the $2,400 line item and any quoted extras in the file.

Jester Climate is the trade on that wall. If the owner flags this scope, call (512) 297-7493. Do not invent a change order on the sidewalk.

Same sub across Georgetown jobs

You want one trade and one number on every Georgetown job that needs a mini split. The number is (512) 297-7493. The business name is Jester Climate.

Call (512) 297-7493 to set up repeat scheduling. Use that number for the next Georgetown job that needs a mini split.

Site walk on the Georgetown lot

Anything variable is confirmed at the site walk. Size, routing, and penetrations are not assumed from a plan note. Call (512) 297-7493 and set the walk.

Until the walk, plug $2,400 into the weekday bid for a standard single zone. Flag anything that looks non standard. That work is quoted before it begins.

Scope of workStandard single zone install

Included in the number

  • Indoor unit at the location confirmed at the site walk
  • Outdoor unit at the location confirmed at the site walk
  • Line set; length confirmed at the site walk
  • Condensate drain; routing confirmed at the site walk
  • Circuit and disconnect; size confirmed at the site walk
  • Wall penetration; location confirmed at the site walk
  • Equipment size confirmed at the site walk
  • Materials and labor for one standard single zone

Quoted before work begins

  • A second zone or an extra indoor unit
  • Condensate pump
  • Line hide or architectural covers
  • Panel work or a circuit that is not standard
  • Roof stand, wall brackets, or a pad that is not standard
  • Relocation of existing equipment
Leave this readySite condition checklist

Have these done before the install date and the day runs clean. Anything not on this list gets looked at during the site walk.

  • Indoor wall clear and accessible
  • Outdoor location clear and accessible
  • Path between indoor and outdoor locations open
  • Other trades off that wall
  • Permit status confirmed by owner or GC
  • Address and access sent to (512) 297-7493
Install dayPhase order, no clock times promised
  • LayoutIndoor and outdoor locations are the ones confirmed at the site walk. Work that is not standard was quoted before it starts.
  • IndoorIndoor unit goes on the wall that was confirmed. Penetration location is the one from the site walk.
  • OutdoorOutdoor unit goes at the confirmed location. A stand, pad, or bracket that is not standard was quoted before work began.
  • Tie inLine set, circuit, and drain run as confirmed at the site walk. If that work is not standard, it was quoted before work began.
  • CompleteThe standard single zone is in and running. Balance is due on completion.

Phases run in this order on a standard job. Site conditions change the pace, so nothing here is a timeline commitment. If something on site is different from the walk, you get told before it turns into cost.

How the money worksTwo payments, no surprises

$400 materials deposit books the date and buys the equipment for your job. Balance due on completion, on the visit the system runs.

$2,400 weekday. $2,600 Saturday or Sunday. One Joker day each week is priced under the weekday rate. The day moves week to week and it is shown on the home page, so if your schedule has slack you can aim at it.

Non standard work is quoted before any work begins. Nothing gets added to the number without you approving it first.

Running the same install across more than one project? Call (512) 297-7493 to set up repeat scheduling.

Questions builders ask
What number do I put in the estimate?
Use $2,400 for a standard single zone mini split installation on a weekday, materials and labor. Use $2,600 if the work has to land on a weekend. Check the home page for Joker Day; that day is priced lower than the weekday rate. Do not put a Joker Day figure in the bid until you read it there.
How do I book a Georgetown job?
Call (512) 297-7493 with the Georgetown job address and the date you want. A $400 materials deposit is required to book. The balance is due on completion.
Do you pull the permit in Georgetown?
No. Jester Climate does not pull permits. Requirements vary by jurisdiction. Confirming that is on the owner or the general contractor.
What blows the $2,400 number?
Anything outside a standard single zone install is extra. Extra indoor units, a condensate pump, line hide, panel work, a non standard stand or pad, and moving existing equipment get quoted before any work begins. Line set, circuit, drain, penetration, and size are confirmed at the site walk.
Can I keep this as a standing line item?
Call (512) 297-7493 to set up repeat scheduling. That is the path for repeat work. Same number you use for a single Georgetown job.
Related builder sheets
Book it

One number, one call, one line item in Georgetown, Texas. Standard single zone mini split install is $2,400 on a weekday and $2,600 on a weekend, materials and labor, $400 deposit to book, balance due on completion.

Call (512) 297-7493